What to Expect
Our Pool Installation Prices Include:
- A WRITTEN GUARANTEE: Our work is guaranteed in writing for your protection.
- ALL BUILDING MATERIALS: (EXCEPT FOR THE SAND AND WATER) We will let you know how much sand you will need depending on what size pool you have.
- HAND TAMP, HAND TROWEL, SAND BOTTOMS: The sand bottom is tamped and troweled to help with vacuuming and to remove wrinkles in the pools liner during installation.
- PATIO BLOCK FILTRATION PAD: To provide a sturdy base for the filtration system to sit on.
- FULL EXPLANATION OF THE FILTRATION SYSTEM: The installer will fully explain how to operate the filtration system.
- ONE DAY INSTALLATION: Installations will be one day unless there are missing parts or the yard has obstructions/conditions that cause delays in the excavation.
- GROUND LEVELING: The first 6″ of ground leveling cost are $500.00. Every Inch thereafter is $25.00 per inch. The ground leveling is done with a bobcat/skid steer a minimum 6′ ft. opening / access is needed. (If access can not be made additional fees will apply to do the leveling with smaller digging equipment and /or hand digging with shovels.)
- FRIENDLY CUSTOMER SERVICE: After your pool is installed you may have some questions or concerns, we will be more than happy to help in any way that we can.
Our High Standards
|